You are here

References

La Toison d'Or

Brussels
Belgium
Construction period: 
2013-2015
Project owner: 
PROWINKO
Architect: 
M & J-M. JASPERSJ. EYERS & PARTNERS
Amount of the works: 
€ 50.000.000
Project

Mixed use buildings are a useful tool in urban (re)development and answer the increasing demand to integrate different functions such as working, living and leisure. This high-end project integrates the following:

  • A 14.000m² retail surface on 3 levels
  • Residential area containing 66 apartments on 7 levels
  • Renovation of 12 apartments in an existing, renovated building
  • Kindergarten
  • A parking lot with a capacity of 320 spaces on 3 levels
Assignment

SECO’s assignment covers the following fields:

  • Technical inspection of closed main fabric technical equipment and finishing works
  • Assessment of Fire Safety
  • Health and safety coordination
  • Energy performance assessment
  • Acoustic comfort and sound intensity