Switchyard roofing in the hydroelectric power plant

Pergau
Malaysia
Construction period: 
1998
Project owner: 
Victor Buyck Steel Construction
Amount of the works: 
€ 396.600
Project

The power station is a hydroelectric power station, with 4 turbines of 150 MW installed capacity. It is the second largest hydroelectric unit of the country according to installed capacity.

Assignment

SECO’s assignment consisted in technical guidance on the steel structure of the switchyard roofing.