You are here

References

North Metro

Brussels
Belgium
Construction period: 
2016 - 2024
Project owner: 
BELIRIS
Amount of the works: 
€ 731.283.000
Project

Extension of the Brussels metro network from the North Station till Bordet Station, essential to meet the growing demand for public transport between the center of Brussels and the north of the Region.

  • Construction of a tunnel with approximative length of 6km
  • Construction of stations and accesses
  • Interconnections with existing railways, trams and bus network
  • Architectural and technical equipments (HVAC, lighting, electronics, signaling)
Assignment

The assignment of SECO consists in an independent third party technical inspection of the civil works, health and safety coorination, and fire safety.